Military Industry |-Japan Hand in Hand, Accompanied for a Long Time --- First Battle of A8 Northeast Reconstruction Project
Release time:
2020/05/16
In May 2020, the epidemic subsided slightly. In order to ensure the safety of the residential area, Times Jiayuan (hereinafter referred to as Times) in Qingan County, Suihua City, Heilongjiang Province has officially launched the maintenance and renovation project of the intercom system of the visual unit electronic door.
In September 2009, Times Jiayuan installed the TOP-2003 visual system of Starlight Building, which adopts 8-type direct-press/digital visual host and handle-type black-and-white visual extension. After ten years of operation, it is basically in good condition. However, some unit doors still include lines. Unit host. The interlayer platform is seriously damaged.

Site physical map of residential area
In view of the star building after 15 years of continuous iteration of the main product E3 system, can be fully compatible with the previous generation of products, and at the same time support network cable and multi-core sheath line two lines, multi-storey buildings also support no inter-layer platform, direct bus parallel connection mode.
In order to complete the maintenance and reform project efficiently and quickly, the construction party: Qingan county blue sky construction and installation engineering co., ltd. has determined that the star building E-3 all-purpose visual system is adopted to complete the era maintenance and reform.
1. For unit doors in good condition, the original multi-core sheath line will remain unchanged, and the faulty equipment will be replaced by E3 system.
2. Unit doors with serious damage and aging lines shall be replaced with network cables, and relevant equipment shall be replaced with E3 system as a whole.

But then a problem, but let has 24 years of production experience in the starlight building made difficult. There are 16 units in the era project: marble wall buried wall protective cover type 8 unit mainframe, while the A8 mainframe that has completed trial production as planned is the same size as the 8 mainframe on site, but its bottom box cannot be directly installed in the protective cover 10 years ago. Or rectify the marble embedded position or change the structural design of the newly finalized A8 host and change the mold.

In the spirit of "perfection. The purpose of "do your best. In view of the emergency demand on site, Xingguang Building Emergency Coordination Mould Factory in April 2020. Completed the mold modification and the first batch of trial production tasks. In May 2020, the A8 unit host that perfectly replaced the 8-type host was sent to the site.

Site Product Chart of Residential Quarter after Renovation
Hand in hand for a day, with constant companionship. Starlight building will uphold the concept of military manufacturing, starlight creation. Along the way with you.

"Focus on good products and make smart products for 20 years". Starlight Building now has eight series of products, 23 years of professional manufacturing experience, 32 sales and service agencies, more than 3000 partners, and more than 50 million end users. As a pioneer and well-known enterprise in the industry, the company continuously improves product performance, always pays attention to the development trend of the same industry in the world, and absorbs a large number of the latest design theories at home and abroad. Starlight building will be in line with the "perfect, dedicated" business philosophy, in good faith to make friends all over the world, to join hands in creating a smart community.
More exciting content please visit the company's official website: http://www.topfs.com